Jenergy Inspections
  • Home
  • Residential
    • Plan Reviews for IECC® >
      • REScheck™ Items Needed List
      • Ekotrope™ Items Needed List
      • REScheck™ vs. Ekotrope™
      • FAQs from Builders
      • Avoiding Re-Inspections
      • Energy Star®
    • Building Pressure Testing
    • Duct Pressure Testing
    • Heat Load Calculations
    • Helpful References >
      • Air Sealing Guide
      • Sample Products
      • When To Call for Inspections
  • Commercial
  • Codes & Standards
    • IECC®
    • RESNET®-HERS Index
    • Energy Star®
  • Contact Us
  • Home
  • Residential
    • Plan Reviews for IECC® >
      • REScheck™ Items Needed List
      • Ekotrope™ Items Needed List
      • REScheck™ vs. Ekotrope™
      • FAQs from Builders
      • Avoiding Re-Inspections
      • Energy Star®
    • Building Pressure Testing
    • Duct Pressure Testing
    • Heat Load Calculations
    • Helpful References >
      • Air Sealing Guide
      • Sample Products
      • When To Call for Inspections
  • Commercial
  • Codes & Standards
    • IECC®
    • RESNET®-HERS Index
    • Energy Star®
  • Contact Us
Items Needed List for REScheck
  • This is a list of additional information and items we will need in order to complete a REScheck for a residential plan review.
  • We cannot complete a REScheck without all of the building information.
  • You can complete the form below or download it at the bottom of the page.
  • Clients can also upload their plans to send them in with the form afterwards. 

    REScheck Items Needed List

    Client Information
    Please select all that apply.
    If you don't use a cell phone, please just enter all zeros.
    If you are not affiliated with a company or do not have an office phone/land line, please just enter all zeros.
    If you are an owner, or not associated with a company, just type "N/A" for Not Applicable.
    If you are an Owner, or not affiliated with a company, please enter your mailing address.
    Builder Information (Skip this section if listed above.)

    Job Site Information
    If listed above, enter "Listed Above."
    If listed above, please enter all ones.
    1.  Type of Project
    2.  Size of Project
    Only include conditioned floor area.
    If the street address is still unknown, enter the LOT/BLOCK/SECTION information, or "0000" Street Name.

    3.  Window Information  *Please note:  Sizes and locations of all windows and doors must be clearly illustrated on the plans.
    For 2009 IECC compliance, it should be .65 or lower. For 2012 IECC compliance, it should be .45 or lower.
    If multiple values exist for various windows, enter the predominant value.
    For 2009 IECC compliance, it should be .30 or lower. For 2012 IECC compliance, it should be .25 or lower.
    For 2009 IECC compliance, this # is not required. Enter "0." For 2012 IECC compliance, it should be .45 or lower.

    4.  Door Information

    5.  Insulation Information
    Enter the primary or main type of insulation used in the EXTERIOR walls.
    R-13 and R-15 are acceptable R-values for 2X4 walls; R-19 is a typical R-value for 2X6 walls. If some will be R-13 and others R-19, enter the value used throughout the majority of the building's exterior walls.
    Only required for Icynene (Foam) or any type of insulation not clearly labeled by the manufacturer at inspection. Call us if you are unsure of this value.
    Only required for Icynene (Foam) or any type of insulation not clearly labeled by the manufacturer at inspection. Call us if you are unsure of this value. A typical value would be 3.5" for 2X4 walls or 5.5" for 2X6 walls if the cavities are going to be filled completely.
    Only required for Icynene (Foam) or any type of insulation not clearly labeled by the manufacturer at inspection. Call us if you are unsure of this value.
    Only required for Icynene (Foam) or any type of insulation not clearly labeled by the manufacturer at inspection. Call us if you are unsure of this value.
    Only required for Icynene (Foam) or any type of insulation not clearly labeled by the manufacturer at inspection. Call us if you are unsure of this value. A typical value would be 3.5" for 2X4 walls or 5.5" for 2X6 walls if the cavities are going to be filled completely.
    Only required for Icynene (Foam) or any type of insulation not clearly labeled by the manufacturer at inspection. Call us if you are unsure of this value. A typical value would be 3.5" for 2X4 walls or 5.5" for 2X6 walls if the cavities are going to be filled completely.

    6.  Structural Information
    7.  HVAC Information
    14 SEER, 16 SEER, etc. are typical values.
    Most professional and licensed HVAC contractors automatically do this as part of the job. If they are not licensed or are unable to do one, we keep a licensed HVAC Contractor on staff who is able to complete these as needed (for a separate fee).
    80%, 85%, 95%, etc. are typical AFUE values.

    8.  Other Options
    Max file size: 50MB

Submit

If you would rather not complete the form online, you may also download it below and email or fax it to us.
ji_items_needed_list_-_rescheck_2.12.pdf
File Size: 101 kb
File Type: pdf
Download File